I just bought an SC17 and it needs halyards and a main sheet. I figure since I'm buying all that I might as well replace the jib sheet. What do you guys recommend for line size and type?
Thanks in advance,
Clint
What size/type line for SC17 Halyards and sheets?
-
- Novice
- Posts: 6
- Joined: April 9th, 2008, 4:31 pm
- Location: Tidewater, VA
-
- Administrator
- Posts: 610
- Joined: November 10th, 2003, 8:22 pm
- Location: Minnesota
- Contact:
-
- Novice
- Posts: 6
- Joined: April 9th, 2008, 4:31 pm
- Location: Tidewater, VA
-
- Administrator
- Posts: 610
- Joined: November 10th, 2003, 8:22 pm
- Location: Minnesota
- Contact:
-
- Novice
- Posts: 6
- Joined: April 9th, 2008, 4:31 pm
- Location: Tidewater, VA
Thanks again Matt.
I was about to order some rope and realized I'm missing some info. My brain works, or doesn't, funny sometimes so forgive me.
What lengths do I need for:
Main Halyard
Jib Halyard
Main Sheet
Jib Sheet
Also, what size and what length do I need for the rudders? They need replacing too.
Clint
I was about to order some rope and realized I'm missing some info. My brain works, or doesn't, funny sometimes so forgive me.
What lengths do I need for:
Main Halyard
Jib Halyard
Main Sheet
Jib Sheet
Also, what size and what length do I need for the rudders? They need replacing too.
Clint